How long does it take?

Usually, the boxes (where everything is stored and shelved) take about one week.  Those stay in your home and the week does not generally consist of 8am to 5pm days, but rather, partial days. For example, the preparation of the area and priming might be done on day one by two p.m., at which point we hit a standstill while the primer dries.  Then, sanding and painting a first coat might be done on day two by noon, and then production hits a standstill again while paint dries. The doors and drawers themselves usually take 3 to 4 weeks.  It sounds like a long time but this allows them to be processed, and substantially cured, before being transported back to your home.  Darker colors can take longer.  If anyone is telling you it’ll go faster than that, BEWARE!